Cisco SCE8000 GBE Instalação - Página 7

Procurar online ou descarregar pdf Instalação para Servidor Cisco SCE8000 GBE. Cisco SCE8000 GBE 21 páginas. 10gbe platform
Também para Cisco SCE8000 GBE: Manual de início rápido (25 páginas), Manual de configuração (18 páginas), Procedimentos de remoção e substituição (36 páginas)

Cisco SCE8000 GBE Instalação
Chapter 4 Installing the Cisco SCE8000 Chassis
Table 4-4
Locale
South Africa
Switzerland
Australia, New
Zealand
Power Distribution
Unit (PDU(=)*
*The PDU power cable is designed for users who power their switch from a PDU. The end of the cable
that plugs into the Cisco SCE8000 chassis has a C19 connector; the other end of the cable that plugs into
the PDU has a C20 connector.
AC Power Cord Illustrations
This section contains the AC power cord illustrations.
Figure 4-1
OL-21054-04
AC-Input Power Cord Options (continued)
Part Number
CAB-7513ACSA= 14 feet (4.3 m)
CAB-ACS-16=
CAB-AC-16A-AU
S=
CAB-C19-CBN
AC Power Cord Plugs and Appliance Coupler for the 2700 W Power Supply
International
North America (Non-locking)
(1900W power supply)
EN 60309 (16A, 250V)
NEMA 6-20 plug (20A, 250V)
Europe
VIIG plug
CEE (7) VII (16A)
Length
14 feet (4.3 m)
14 feet (4.3 m)
14 feet (4.3 m)
(1900W power supply)
Appliance coupler
C19W coupler
Hot EN60320/C19 (20A)
Cisco SCE8000 10GBE Installation and Configuration Guide
AC-Powered Systems
Power Cord
Reference
Plug Rating
Illustration
250VAC, 16A
Figure 4-9
250VAC, 16A
Figure 4-10
250VAC, 16A
Figure 4-11
250VAC, 16A
Figure 4-12
North America (Locking)
(1900W power supply)
NEMA L6-20 plug (20A, 250V)
4-7