Cisco UCS B260 M4 Nota de instalação e manutenção - Página 17
Procurar online ou descarregar pdf Nota de instalação e manutenção para Servidor Cisco UCS B260 M4. Cisco UCS B260 M4 50 páginas. Blade server
Também para Cisco UCS B260 M4: Nota de instalação e manutenção (46 páginas)
Installing a Blade Server
This chapter contains the following sections:
•
•
•
•
•
Installing a Blade Server in the Chassis
If a UCS B460 M4 blade server is mixed with other full-width or half-width blades in the chassis, the UCS
B460 M4 blade servers must occupy the bottom two full-width slots in the chassis. The chassis should be
loaded with the largest server on the bottom, starting with a UCS B460 M4 blade server on the bottom,
followed by full-width blades above, and the half-width blades at the very top of the chassis.
Procedure
Step 1
If necessary, remove the slot divider from the chassis.
a) Simultaneously pull up on the left side catch and push down on the right side catch as shown in callout 1
of the following figure.
b) Pull the slot divider out of the chassis as shown in callout 2 of the following figure. Keep the slot divider
in case it is needed at another time.
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
Installing a Blade Server in the Chassis, on page 9
Server Configuration, on page 11
Powering Off a Blade Server Using the Power Button, on page 11
Removing a Blade Server from the Chassis, on page 12
Server Troubleshooting, on page 12
2
C H A P T E R
9