Cisco SM-X-24FXS/4FXO Manual de instalação do hardware - Página 27
Procurar online ou descarregar pdf Manual de instalação do hardware para Porta de entrada Cisco SM-X-24FXS/4FXO. Cisco SM-X-24FXS/4FXO 40 páginas. Voice gateway
- 1. Table of Contents
- 2. Location and Mounting Requirements
- 3. Temperature Control and Ventilation
- 4. Rack Requirements
- 5. Access to Chassis
- 6. Power Source and Supply
- 7. Network Cabling Considerations
- 8. Interference Considerations
- 9. Required Tools and Equipment for Installation
- 10. Site Log
- 11. Installation Checklist
Installing the Cisco VG400 Voice Gateway
Figure 6: Chassis Ground Connection on the Router
Step 4
Connect the other end of the ground wire to a known reliable earth ground point at your site.
Connect to Power Supply
This section explains how to connect AC power to the voice gateway.
Warning
Read the installation instructions before using, installing or connecting the system to the power source.
Statement 1004
Power-On Procedure
Perform this procedure to power on your Cisco VG400 Voice Gateway, and verify that it goes through its
initialization and self-test. When this is finished, the Cisco VG400 Voice Gateway is ready to configure.
To power on the Cisco VG400 Voice Gateway, perform the following:
Before you begin
Before you power on the Cisco VG400 Voice Gateway, ensure that:
• The chassis is securely mounted
Cisco VG400 Voice Gateway Hardware Installation Guide
Connect to Power Supply
25