Acuity Brands Gotham SQAZ Instruções de instalação

Procurar online ou descarregar pdf Instruções de instalação para Racks & Stands Acuity Brands Gotham SQAZ. Acuity Brands Gotham SQAZ 2 páginas. Mounting frames

INSTALLATION INSTRUCTIONS
SQF, SQAZ and SQHZ
Mounting Frames
Upon receipt, thoroughly inspect for any
freight damage which should be brought
to the attention of the delivery carrier. Com-
pare the catalog description listed on the
packing slip with the label on the carton to
ensure that you have received the correct
merchandise.
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING: Risk of fire. Do not install
insulation within 3 inches of fixture sides
or wiring compartment, nor above the fix-
ture in such a manner as to entrap heat.
1. Electric current can cause painful
shock or serious injury unless handled
properly. For your safety, always
remember the following:
·
Turn off the power supply.
·
Ground the fixture to avoid poten-
tial electrical shocks.
·
Do not handle an energized fixture
or energize any fixture with wet
hands, when standing on a wet or
damp surface, or in water.
2. Specific safety information concerning
lamps:
·
Match wattage of fixture and lamp
exactly.
·
Do not remove or insert lamp when
power is on.
·
Do not scratch glass or subject lamp
to undue pressure as either may
cause lamp breakage.
·
Protect operating lamp from sources
of moisture.
·
If lamp is marked
it contains
Hg
mercury. Follow disposal laws. See:
www.lamprecycle.org.
SAVE THESE INSTRUCTIONS
Clamping
latch arms
Open
Closed
Figure 1
Bent tab
Channel
bar
Figure 2
Mounting
frame
Ceiling
Figure 3
Sight
Notches
Figure 4
Remove
knockouts
as needed
Figure 5
NEW INSTALLATION FOR SQ
Lay-in panel T-bar ceiling:
1. Cut ceiling opening slightly larger
than the outside diameter of the
mounting frame.
2. Position mounting frame through
opening in ceiling. Release clamp-
ing latch arms and adjust channel
bars to the correct spacing be-
tween T-bar as shown in Figure 1.
Secure channel bars to T-bar by
means of wire ties, screws or by
T-Bar
bending ends onto T-bar as shown
in Figure 2.
3. Once mounting frame has been
Wire tie
secured in structure, adjust the
mounting frame vertically to align
the bottom edge to either flush or
slightly above (1/8" max) the ceiling
line (Figure 3). Secure mounting
frame into position by closing the
clamping latch arm. The notch
located in the draw-down flange of
the housing can be used to assist
Flush or
slightly above
with alignment of multiple fixtures
ceiling line
(Figure 4).
4. If additional security is required, a
No. 8 sheet metal screw, wire tie or
wire (not supplied) may be used to
tie the latch arm to the mounting
frame as shown in Figure 1.
5. Remove knockouts on junction box to
feed power supply to fixture as
shown in Figure 5. Supply wire must
meet applicable electrical codes
and be rated for a minimum of 75
Junction box is thru-wire rated for 8-
No. 12 AWG conductors (4 in-4 out).
6. Complete necessary wire connec-
tions. Snap the door onto the junc-
tion box.
7. To adjust trim after installation, see
" Trim-Post Installation Adjustment."
©2007, 2010 Acuity Brands Lighting, Inc.
o
C.
CJ520004 Rev. B
1 of 2 6/10
All Rights Reserved