Argos Portabase Instruções de montagem - Página 2
Procurar online ou descarregar pdf Instruções de montagem para Mobiliário de interior Argos Portabase. Argos Portabase 4 páginas.
Assembly: Only for Groundsman
Step 1
Identify the 2 long beams
and the remaining shorter
beams.
On a level surface create
the required layout, as
shown. Secure the shorter
beams in place using 2x
100mm screws as shown in
the diagram.
* Important, Ensure that all short beams
are equally spaced.
Step 2
With the portbase in the desired position for the buildings
framework using 3x40mm round head screws pre-drilling
with a 2mm drill bit. Ensure that the base is level. Either of
Pre-Drill with
2mm bit
Step 3
To secure the base to the ground,
hammer in the spikes at each corner
untill level with the top of the base,
using a piece of scrap wood to
prevent damage to the spike.
Step 4
Pre-Drill with
2mm bit
If the Portabase is to be located onto hardstanding, only the L shaped Foot are used. Position the portabase
through the joists lined up with the beams of the Portabse.
On soft ground we would recommend the use of post-mix concrete to secure the corner spikes.
N.B The building must be erected on the portabase as it cannot be moved once erected.
Once the Spike is in the desired
round head screws as shown. Pre-drill
using a 2mm drill bit.