CALEFFI altecnic SATK102 Manual de Instruções de Instalação, Operação e Manutenção - Página 9
Procurar online ou descarregar pdf Manual de Instruções de Instalação, Operação e Manutenção para Equipamento de gravação CALEFFI altecnic SATK102. CALEFFI altecnic SATK102 12 páginas. Heat interface unit
SAT102
heat interface unit
Replacing or cleaning the DHW priority flow meter turbine
•
Extract the flow sensor.
•
Unscrew and remove the cartridge (H).
•
Remove any impurities present or change the cartridge if necessary.
•
Screw the cartridge back into position.
•
Re-position the flow sensor.
When carrying out maintenance on the electrical part, for the
connections follow the diagram on page 8.
After concluding maintenance, proceed with the filling and checking
operations described in the chapter "Commissioning" - see page 4.
If you require any information regarding replacement components,
please contact Altecnic.
H
8