aerauliqa QR350MBP Manual de instalação - Página 11
Procurar online ou descarregar pdf Manual de instalação para Ventilador aerauliqa QR350MBP. aerauliqa QR350MBP 16 páginas. Heat recovery ventilation unit
other side in summer time (table 6.b).
The condensate water is led out through drainage pipe.
Thermistors
Temperature probes to implement temperature dependent functions.
8.3 Maintenance
Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or electrical work!
• Keep the unit surface free from dust.
• Clean the filters every three months with a vacuum cleaner and replace the filters every year. This may differ per situation depending on internal and
external environmental conditions (fig.8 b-c-d-e-f-g).
Fig. 8.b
Fig. 8.d
Fig. 8.f
WARNING
Fig. 8.c
Fig. 8.e
Fig. 8.g
11