Zanussi ZHC960 Manual de Instruções - Página 6
Procurar online ou descarregar pdf Manual de Instruções para Campânula de ventilação Zanussi ZHC960. Zanussi ZHC960 13 páginas. Zanussi owners manual ventilation hood zhc960
Também para Zanussi ZHC960: Folheto de instruções (17 páginas)
INSTALLATION
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre
of the area in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob. Place bracket 7.2.1
1-2 mm from the ceiling or upper limit aligning the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket 7.2.1
7.2.1
7.2.1
7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
7.2.1
chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 323 mm above
the horizontal reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs 11 11 11 11 11 in the holes.
• Fix the brackets using the 12a
• Insert the two screws 12a
6 mm between the wall and the head of the screw.
GB
Wall drilling and bracket fixing
12a
12a (4,2 x 44,4) screws supplied.
12a
12a
12a
12a
12a
12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-
7.2.1 on the wall as shown about
7.2.1
7.2.1
7.2.1
16