Clarke PPH10ND Instruções de funcionamento e manutenção - Página 9
Procurar online ou descarregar pdf Instruções de funcionamento e manutenção para Compressor de ar Clarke PPH10ND. Clarke PPH10ND 20 páginas. Air compressor
Também para Clarke PPH10ND: Manual de operação e manutenção (10 páginas), Instruções de funcionamento e manutenção (17 páginas)
When starting
subsequently,
start the machine as
follows:
l
.
At
the
beginning of
t
he
day.
open
the drain
cock and
allow
any
condensate
to drain
completely,
then close
the
cock.
2.
To
ease starling,
ensure
there
is
no
pressure in the pump
outlet
manifold
by
opening
the
Bleed Valve
(See Fig.2).
3.
Connect the air
hose to
one
of
the
outlets and
the
a
ir
tool and set the p ressure
regulator
to
zero pressure
(turned
fully
anticlockwise).
4.
Start
the engine in
accordance
with
the
instructions contained
in
the engine
service
manual, then close
the
bleed valve and allow
p
ressure
to b
uild up.
5.
When the Air
Governor/Load Genie
hos operated
and
the
compressor
hos
gone
'off
line'. slide
t
he
outlet
valve oulwords fully then
adjust
the
pressure
regulator
so
that
the desired
pressure
is
registered
on
the g auge.
6.
Check for air
leaks at lhe
tool
and connectors
...
as
above, before
proceeding
STOPPING THE COMPRESSOR
Atthe
end
of
the
d
a
y,
stop
the
compressor
in accord ance
with
the instructions
in
the engine
manual.
then open the
d
rain
cock.
Close the
air
outlet by
sliding
both
valves
inwards.
Operate the air
tool
trigger or
operating
lever etc., to ensure there Is no
pressure
In
the air
line.
then disconnect airline
and
tool.
WARNING!
DO NOT under any circumstances attempt to remove the air tool or disconnect
the air hose until you ore satisfied that the pressure has been relieved.
Finally.
close
the
drain
cock.
Toke
core
not to
touch
the engine
or
pump as
they remain
hot for
some time
ofter
use.
1:1111·1:1i
INTERNATIONAL
-
ail'-
-
- -
--
-
0
-
- - - -
-Cl;11•la!