CLAS 3700461403002 Manual - Página 8

Procurar online ou descarregar pdf Manual para Valetes CLAS 3700461403002. CLAS 3700461403002 12 páginas. Trolley jack 2t

CLAS 3700461403002 Manual
OH 6302BL
TROLLEY JACK 2T

SPECIFICATIONS

- rotating soleplate
- robust chassis
- anti-overload system
- transportation handle
- min. H.: 135mm
- max. H.: 340mm
- handle length: 740mm
- weight: 8.7kg
USE
Preparation
• Open the drain valve (1) and insert the handle (extension) supplied into the pump arm (2). In
order to distribute the oil completely, pump the handle about 6 times.
• Close the drain valve - the vehicle jack is now ready for use.
Lifting
• Place the vehicle on a fi rm, fl at surface and lock the wheels of the vehicle.
• To ensure safe lifting, position the jack at a 90° angle to the vehicle and under the appropriate
lifting point (see manufacturer's instructions).
• Insert the handle into the drain valve and close it by turning it clockwise until it stops.
• Insert the handle into the pumping arm and pump the handle until the soleplate (3) is in contact
with the vehicle.
• Check again that the jack is in place.
• Continue pumping the handle until the vehicle is lifted to the desired height.
Caution: Observe the vehicle carefully during the lifting operation. The jack must move in the
direction of the vehicle during the lifting operation. If it does not, there is a high probability that
the vehicle will slip off the jack.
• Pull the handle out of the pump arm (risk of accident!).
• Secure the load with suitable jack supports before starting work on or under the vehicle.
WARNING: It is not permitted to work on or under the vehicle without fi rst securing the lifted load
in the appropriate manner: with candles (otherwise there is a risk of accident!).
• After completing work on the vehicle, open the drain valve by carefully turning the jack handle
in small steps in an anti-clockwise direction until the vehicle begins to descend.
• Once the vehicle is on the ground, the drain valve can be opened again (about half a turn) to
bring the lifting arm (4) all the way back to the starting position.
• Before lifting the load, check that the drain valve is closed.
• All moving parts must be lubricated in accordance with the operating instructions and maintained
regularly.