3Com OfficeConnect 3CR100A97 Manual de início rápido - Página 4

Procurar online ou descarregar pdf Manual de início rápido para Porta de entrada 3Com OfficeConnect 3CR100A97. 3Com OfficeConnect 3CR100A97 17 páginas. Adsl data

Package
Contents
Positioning
the
2
Gateway
Figure 1
Unpack the contents of your package, and ensure that it includes
the following items:
• AC/DC, 18 watt Power Adapter and Power Cord
• LAN cable, RJ-45 (CAT-5), Blue
• ADSL cable, RJ-11/RJ-11, Black
• Rubber feet (4)
• Stacking clip
When positioning your OfficeConnect Gateway, make sure of the
following:
• Unit is out of direct sunlight and away from sources of heat.
• Cabling is away from power lines, fluorescent lighting fixtures,
and sources of electrical noise such as radios, transmitters, and
amplifiers.
• Water or moisture cannot enter the case of the unit.
• Air flow around the unit and through the vents in the side and
back of the case is not restricted. A minimum of 1 in. (2.54 cm)
clearance is recommended.
Using Rubber Feet and Stacking Clip
For desktop use, the four self-adhesive rubber feet
help to stabilize your OfficeConnect Gateway and pre-
vent sliding. Attach the feet to the marked areas at
each corner of the underside of your OfficeConnect
Gateway.
In addition, the stacking clip provided may be used
for stacking any other OfficeConnect units, such as the
OfficeConnect Gateway Voice Expansion Unit or
OfficeConnect Ethernet hubs and switches, neatly and
securely together. You can stack up to a maximum of
four units. To stack your units, secure the clip as
shown in Figure 1.