CTS PATCO PE-BT-03 Instruções de utilização - Página 4
Procurar online ou descarregar pdf Instruções de utilização para Equipamento de teste CTS PATCO PE-BT-03. CTS PATCO PE-BT-03 5 páginas. Land warrior battery tester / analyzer
Testing Sequence 2
Reading Smart Battery Data (SBD)
Note:
This operation can be performed immediately
following the completion of Test Sequence 1, or performed
independently. If immediately following Test Sequence 1,
proceed to step 3 below.
1. Connect battery to tester via the docking station
or cable, see section Connecting to Batteries.
2. Press ON button until startup screen displays
PATCO
(figure
1).
3. Press and release DATA button. During
communication with the battery, Reading Data
will be displayed. The tester will then cycle
through SBD, displaying the data as shown in
Figure 5 through Figure 7. See Table 2, SMBus
Data Codes. Use the up (↑) and down (↓) arrows
to cycle between screens.
4. The tester will return to IDLE and turn off after 30
seconds, if not used.
Screen Data Codes
PV (not SBD from SMBus)
BV
SOC
BT
CC
FC
©2014 Creating Technology Solutions
The information contained herein is for reference only and does not constitute a warranty of performance
CTS IS AN AUTHORIZED RESELLER AND DISTRIBUTOR FOR PATCO ELECTRONICS
SMBus Data Codes
Creating Technology Solutions, LLC
Tel 321-418-3055
|
Fax 321-418-3044
|
All information subject to change without notice
O P E R A T I N G I N S T R U C T I O N S
Screen display showing pack voltage and
battery voltage, where xx.x is the voltage
Screen display showing state-of-charge and
battery temperature where xx is the state
of charge and xx.xx is the battery
temperature in degrees Celsius (°C)
Screen display showing cycle count and Full
Charge Capacity where xx.x is the capacity
SBD read from SMBus
Voltage measured at battery output terminals
Battery voltage
Relative state of charge
Battery temperature in degrees Celsius
Cycle count
Full Charge Capacity in Ah
Table 2
|
P.O. Box 5827
|
Titusville, FL 32783
| www.crtes.com |
CAGE Code: 6Y7W5
L AN D W A R R I O R B AT T E R Y
T E S T E R / A N AL Y Z E R
P E - B T - 0 3
PV=xx.x
BV=xx.x
Figure 5
SOC=xx%
BT=xx.xx
Figure 6
CC=xx
FC=xx.x
Figure 7
in Ah
| April 2014
|
Rev.02