Acorn Safety S0440-FRV Instruções de instalação, operação e manutenção - Página 3

Procurar online ou descarregar pdf Instruções de instalação, operação e manutenção para Produto de canalização Acorn Safety S0440-FRV. Acorn Safety S0440-FRV 5 páginas. Freeze resistant wall mounted emergency eye/facewash

Installation & Operation Manual

INSTALLATION INSTRUCTIONS:

Supplies required: (not provided by Acorn)
1. Wall fastener anchors, washers and bolts for eyewash
assembly.
(Machine threads or lag bolts based on construction.)
2. Pipe sealant or Teflon tape for sealing water
connections.
IMPORTANT: FLUSH WATER SUPPLY LINES PRIOR
TO CONNECTION TO SAFETY EQUIPMENT.
NOTES:
Top of spray nozzles must be between 33"- 45" from
finished floor in order to meet ANSI Z358.1
Use hand tools and wrenches in a manner which will
prevent marring finished surfaces. Strap wrenches or
tools with plastic jaw linings are highly recommended.
Refer to Rough-in for location of supply and drain lines.
Fragments of Teflon tape or pipe sealant residue can
interfere with the proper operation of this unit. Ensure
pipe sealant methods do not cause contamination in the
system.
STEP ONE: MOUNTING
1. Position assembly on wall at appropriate height and in
proximity to the supply and drain lines.
2. While holding the assembly level against the wall, mark
position of mounting bolt holes.
3. Remove assembly and install appropriate anchors into
wall to receive 3/8" diameter bolts (supplied by others).
4. Re-position assembly against wall and install 3/8" bolts
to secure the assembly to the wall.
5. Assemble activation rod to valve bracket and secure
with nut. See detail "A".
6. Assemble activation paddle to activation rod and secure
with provided screws. See Detail "B"
STEP TWO: SUPPLY LINE
1. Install water line (Supplied by others), in a position, to
align with ½" ball valve as shown in Rough- in.
2. Make connection to ½" NPTF ball valve with appropriate
fittings (Supplied by others)
3. Open water supply.
4. Test for leaks, proper operation and flow.
STEP THREE: SIGNAGE & INSPECTION
1. Position sign with clear visibility, in close proximity to
safety equipment and mark mounting hole locations.
2. Select appropriate ¼" anchors, screws and washers
(Supplied by others) to install signage.
3. Attach inspection tag supplied, with plastic zip tie.
NOTE:
REFER TO ANSI 2358.1 FOR SIGNAGE AND LIGHTING
REQUIREMENTS.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-516-001
MOUNTING
SCREWS(PROVIDED
BY INSTALLER)
1-1/4" OD
TAILPIECE
MOUNTING
HARDWARE
(DETERMINED
AND PROVIDED
BY INSTALLER)
DETAIL "A"
Page 3 of 5
DETAIL "A"
DETAIL "B"
DETAIL "B"
Revised: 06/01/2022