Acorn Safety S0950-AS Instruções de instalação, operação e manutenção - Página 3
Procurar online ou descarregar pdf Instruções de instalação, operação e manutenção para Produto de canalização Acorn Safety S0950-AS. Acorn Safety S0950-AS 5 páginas. Eye/facewash
Installation & Operation Manual
INSTALLATION INSTRUCTIONS:
Supplies required: (not provided by Acorn)
1. Wall fasteners for sign mounting.
2. Pipe sealant or Teflon tape for sealing water connections.
IMPORTANT: FLUSH WATER SUPPLY LINES PRIOR TO
CONNECTION TO SAFETY EQUIPMENT.
NOTES:
· Top of spray nozzles must be between 33"- 45' from
—
finished floor in order to meet ANSI Z358.1
· Refer to Rough-in for location of supply and drain lines.
—
· Fragments of Teflon tape or pipe sealant residue can
—
interfere with the proper operation of this unit. Ensure
pipe sealant methods do not cause contamination in the
system.
STEP ONE: MOUNTING
1. Remove strainer, nut & washer.
2. Position assembly on deck allowing clearance for spray
heads when unit is in closed position and meets ANSI
Z358.1 in open position.
3. Make appropriate preparations for mounting unit by
drilling (2) holes (1) for supply and (1) for alignment pin.
4. Re-position assembly and install using supplied nut &
washer.
5. Reinstall strainer.
STEP TWO: SUPPLY LINE
1. Install water line (supplied by others) in a position to align
with ½" strainer.
2. Open water supply.
3. Test for leaks, proper operation and flow.
STEP THREE: SIGNAGE & INSPECTION
1. Position sign with clear visibility, in close proximity to
safety equipment and mark mounting hole locations.
2. Select appropriate ¼" anchors, screws and washers
(Supplied by others) to install signage.
3. Attach inspection tag supplied, with plastic zip tie.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-402-001
SUPPLY LINE
(SUPPLIED BY OTHERS)
Page 3 of 5
Revised: 08/16/19