Discovery Telecom MINDBLOWN Manual de instruções - Página 6
Procurar online ou descarregar pdf Manual de instruções para Brinquedo Discovery Telecom MINDBLOWN. Discovery Telecom MINDBLOWN 17 páginas.
WIRING SEQUENCE AND CONNECTIONS
Insert the metal end of the wire into the spring connector next to the
number shown on the board.
In
Circuit 1, below, the connection sequence is;
4-12 Battery positive pole (+) to LED (+)
11-23 LED negative to Main Switch
24-3 Main Switch to Battery negative (-)
When completed, the circuit connections will look like the image on the
right.
Always turn o the Main Switch before connecting or
disconnecting wires.
CIRCUITS
Building a simple LED circuit
01
4-12 • 11-23 • 24-3
When the switch is moved to "On" the Gr
You can move the wires to another LED and repeat the experiment.
Just make sure that you connect to the positive and negative poles
in the right order or the LED will not work.
Introducing the Reed Switch
02
4-10 • 9-26 • 25-3
The Main Switch is not in the circuit, so if you turn it on nothing
will happen. Instead, move the Magnetic Rod near the Reed
Switch and it will close, turning on the LED. Make sure that the
arrow on the magnetic rod is pointing down.
Introducing Resistance and Current
03
4-21-23 • 24-15 • 22-13 • 14-16-8 • 7-3
Main Switch.
Now, press the Push Switch. The Blue LED will come back on, but
brighter.
The Main Switch's path has greater resistance (1kΩ or 1,000
ohms) than the other path with only a 100Ω resistor. This means
more power can get to the LED through the Push Switch, making
it glow brighter.
CIRCUITRY KEYBOARD
11
23
24
9
26
25
8
7
22
14
13
16
15
24
ELECTRONIC CIRCUIT EXPERIMENT KIT
12
3
4
10
4
3
3
4
21
23