Aerial DH 18 Manual de instruções - Página 6

Procurar online ou descarregar pdf Manual de instruções para Desumidificador Aerial DH 18. Aerial DH 18 14 páginas.

Aerial DH 18 Manual de instruções

5.2 electrical connection

Before connecting the air dryer, the following items must be checked:
Ø Does the mains voltage coincide with the voltage of the appliance?
Ø Adequate fusing of socket and supply system?
Ø Has the required residual-current-operated circuitbreaker (r.c.c.b) been installed
in case of swimming baths?
Ø If a cable drum is used: has it been unwound completely?
Ø Is the appliance connector suitable for the building socket?
Ø Is the socket provided with a earth connection?
ATTENTION:
Before putting the air dryer into operation, the technical data of the appliance
should be compared to the conditions prevailing in the room of installation!

5.3 Putting into operation

ATTENTION:
Before putting the air dryer into operation, the instruction manual should be studied
carefully. Thus, damages by a false or inappropriate operation as well as by
inadequate environmental conditions can be avoided.
For using the air dryer, please proceed as follows:
Ø After having been transported, the air dryer should rest for about 15 min. During
this period of time, the oil inside the refrigerating system, that was foamed
during transport will return into the compressor. We recommend this procedure
since it extends the service life of the compressor.
Ø Put the plug into the socket. The green neon lights up.
page 6 of 14