Aerial Assault Wakeboard Tower Manual de instalação - Página 12
Procurar online ou descarregar pdf Manual de instalação para Equipamento de navegação Aerial Assault Wakeboard Tower. Aerial Assault Wakeboard Tower 13 páginas.
STEP 17
STEP 18
STEP 19 - LOCKING ThE ROTATING FITTINGS
12
Once all the holes are drilled and all the fasteners are inserted
(M10 x 75mm - Button Head Socket Bolt) the nylon lock nuts can
be installed and all of the fasteners and nuts can be firmly tight-
ened.
You may need to vacuum up the debris and aluminum shavings.
Note: We recommend using Red Loctite Threadlocker when
installing these fasteners and any other fasteners that will not
require loosening once installed.
To install the board rack fingers, use the socket head cap
screws provided and attach the fingers to the diamond
shaped plate. This diamond plate will then be installed to
the rear switch blade legs.
Once you are happy with your tower installation and all
of the fittings are lined up to allow the tower to fold and
function correctly it will then be important to firmly lock the
fittings in place to prevent any unwanted rotation or loos-
ening. We recommend using threadlocker during this step.
m6 x 12mm
GUIDE#: pwb-ASSAULT-004