aerl EarthGuard EG-300 Manual de instalação e operação - Página 9

Procurar online ou descarregar pdf Manual de instalação e operação para Instrumentos de medição aerl EarthGuard EG-300. aerl EarthGuard EG-300 15 páginas. Earth leakage detection

aerl EarthGuard EG-300 Manual de instalação e operação

Wiring Information

The EarthGuard can be installed on to either a 48V or 120V Nominal Battery Bus in systems with a
connected PV array not exceeding 300V DC.

Wire and Disconnect Sizing

IMPORTANT
Use appropriate Personal Protective Equipment when handling live connections and
disconnect all power sources prior to making any wiring configuration changes.

EarthGuard EG-300

The 5V Input (USB-C) and fault monitoring lines are internally fused. The 12V input is not fused
and requires an appropriately sized disconnect when not being powered from the CoolMax SRX
12V line (which is fused internally on the SRX side).
A jumper connection allows for the choice between 5V and 12V power. The EarthGuard ships
with the jumper located on JP2 for 5V (USB-C) from factory and must be moved to JP1 to power
the device from a 12V source.
14 to 24 AWG (0.2 mm
Use an insulated flat blade screwdriver to secure the connections.
Torque all terminal connections to 0.6 Nm (5 in-lb).

Wiring Compartment

CAUTION – Hazard
All EarthGuard wiring must enter the unit through the cable glands in the base plate or
through the top of the enclosure with the top plate removed when being installed in an
integrated configuration with a CoolMax SRX charge controller.
Under absolutely no circumstances should holes be drilled anywhere into the unit to
make other cable entry points. Doing so can cause metal swarf or fillings to enter the
internal electronics and damage the unit once powered up.
To install cabling and configure the device, the 4 x M4 CSK Phillips Screws holding the lid in place
must be removed. When removing the lid, gently disconnect the 10-way cable from the circuit board and
re-fit the cable prior to powering up the device.
IMPORTANT
DO NOT remove the lower 2 x M4 CSK Screws from the USB-C panel as this may
cause alignment issues with the USB connection port.
AER013 REV 1.1
2
-> 2.08 mm
2
) may be used for all internal terminal connections.
USER MANUAL
EarthGuard – EG-300
Australian Energy Research Labs
AER013 – Rev 1.1
21st July 2020
9