ABC PROIZVOD CONCEPT 2 Instruções técnicas - Página 10

Procurar online ou descarregar pdf Instruções técnicas para Utensílios de cozinha ABC PROIZVOD CONCEPT 2. ABC PROIZVOD CONCEPT 2 16 páginas. Central heating cookers

ABC PROIZVOD CONCEPT 2 Instruções técnicas
Scheme of the cooker connection to closed central heating
1. Cooker Concept 2
2. Smoke tube
3. Valve
4. Closed expansion vessel
5. Manometer
6. Radiator valve
7. Radiator
8. Air valve
9. Circulation pump
6. OPERATION – FUEL FEEDING
Solid fuel has to be physically separated from the cooker by means of spatial and physical barrier.
Ashtray needs to be made of non-flammable ingredients and it has to be placed away from fuel
storage area.
INITIAL FUEL FEEDING
The following conditions need to be met at the initial fuel feeding:
• chimney has to be clean and duly connected with the cooker,
• the cooker and heating utility need to be equipped with all safety devices,
• at the initial fuel feeding, pull the flap handle, F.1, pos. 5 (Cooker Concept 2), completely, for
more convenient passage of additional cold smoke gases , and once the desired temperature
is reached, return the handle into the suitable position, depending on operating mode,
• fill the system with water and remove the air
• in cooker operating mode, firebox door and ashtray door need to be closed,
• set the automatic drought controller button to the desired value,
• max. cooker working temperature is 90°С.
Picture number 6
10. Safety valve
11. Thermal valve
12. Water supply connection line
12'. Hot water drain
13. Thermal valve probe
14. Distribution line
15. Safety valve connector
16. Returning line
17. Load and unload connector 1/2"
9