ClearSpan 1060SS Manual - Página 2
Procurar online ou descarregar pdf Manual para Tenda ClearSpan 1060SS. ClearSpan 1060SS 18 páginas. Add-a-bay shade
CLEARSPAN
SUNBLOCKER SYSTEM
™
YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER.
Thank you for purchasing this ClearSpan™ SunBlocker™
shelter. When properly assembled and maintained, this
product will provide years of reliable service. These
instructions include helpful hints and important information
needed to safely assemble and properly maintain the
shelter. Please read these instructions before you begin.
If you have any questions during the assembly, contact
customer service for assistance.
SAFETY PRECAUTIONS
•
Wear eye protection.
•
Wear head protection.
•
Wear gloves when handling metal tubes.
•
Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
•
Do not climb on the shelter or framing during or after
construction.
•
Do not occupy the shelter during high winds,
tornadoes, or hurricanes.
•
Provide adequate ventilation if the structure is
enclosed.
•
Do not store hazardous materials in the shelter.
•
Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this shelter, please read the MUST
READ document included with the shipment.
WARNING: The anchor assembly is an integral part
of the shelter construction. Improper anchoring may
cause shelter instability and failure of the structure to
preform as designed.
Failing to anchor the shelter properly will void the
manufacturer's warranty and may cause serious injury
and damage.
2
Visit www.ClearSpan.com for additional products and customer assistance.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
•
Never erect the structure under power lines.
•
Identify whether underground cables and pipes are
present before preparing the site or anchoring the
structure.
•
Location should be away from structures that could
cause snow to drift on or around the building.
•
Do not position the shelter where large loads such as
snow and ice, large tree branches, or other overhead
obstacles could fall.
SITE
After choosing a location, proper preparation of the site is
essential. Follow the information below.
•
A level site is required. The site must be level to
properly and safely erect and anchor the structure.
•
For sites that are not concrete or gravel, placing wood
blocks or other suitable supports under each rafter leg
or the perimeter base frame helps prevent the pipes
from sinking or working into the site. Does not apply to
shelters with ground posts.
•
Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING: The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques must seek the help of a qualified
contractor.
Revision date: 10.04.07