ClearView PowerBoards PB-DG-001 Manual de instalação e do utilizador - Página 5

Procurar online ou descarregar pdf Manual de instalação e do utilizador para Acessórios para automóveis ClearView PowerBoards PB-DG-001. ClearView PowerBoards PB-DG-001 9 páginas. For ram 1500 pick-up truck 2015-2018

5. Re-assemble the Swivel Idler Brackets removed in Step 1, to the Top Mounting Brackets now secured to
the Vehicle Sill Panel, using the hardware removed in Step 1.
6. Position the Running Board to the Swivel/Idler Brackets. The square slot in the underside of the Running
Board contains 3xsquare bar brackets, with 2 tapped holes in each bar.
These bars are to be nested into the slots on the Swivel/Idler Brackets with the clearance holes in the
Brackets aligned with the tapped holes in the bar.
Loosely secure the Running Board with the M6 Socket Head Bolts and Spring Washers. Ensure Running
Board is in central position before final tightening of the bolts.
Page | 5
Due to Clearview Continuous Improvement Program, information may change without notice.
Clearview takes no responsibility for the result of incorrect use of these installation instructions.
M8 Nuts x 11
M8 Bolts x 11
PB-TA-001
PB-DG-001
April 2018