Aluma Tower Company TM61WA812-EB4S812 Manual de instruções - Página 6
Procurar online ou descarregar pdf Manual de instruções para Veículo utilitário Aluma Tower Company TM61WA812-EB4S812. Aluma Tower Company TM61WA812-EB4S812 12 páginas. Tower setup with guy wires includes guying to outriggers
6.
ERECTING THE TOWER AT FULL HEIGHT
1. While the tower is still in the horizontal position, loosen and remove the hold
down restraining cables that hold the tower in place for transporting. These cables
are located on the front support of the trailer and/or shelter(see Fig. 7).
NOTE: There may be more than one hold down cable at varying locations,
depending on your specific model.
2/13/2012
Fig. 6 Proper Guy Wire Configuration
IMPORTANT! Check winch cable and insure the cable is
properly seated on each pulley sheave. Using the winch, apply
tension to the winch cable BEFORE tilting to the vertical
position. This will keep the cable properly seated on the sheave
and keep the pulleys from being damaged.
Fig. 7 Trailer Tower Component Locations
Page 5
TRAILER TOWER SETUP INSTRUCTIONS-GUYED TO OUTRIGGERS