Alvarado MSG Manual de instruções de instalação e manutenção - Página 13

Procurar online ou descarregar pdf Manual de instruções de instalação e manutenção para Vedações & Portões Alvarado MSG. Alvarado MSG 20 páginas. Full height maximum security gate

MSG Installation and Maintenance Instructions

Microswitch Push Bar Wiring Instructions

WARNING
1. The push bar is wired in series with the gate activation switch. To acomplish this, connect the RED wire
from the push bar to the POSITIVE (+) conduit lead wire on the power supply side of the conduit.
2. Connect the WHITE wire from the push bar to the POSITIVE (+) RED lock wire. The RED and WHITE
wires from the push bar as well as RED lock wire can be found coming out of the wire access hole located
at the top of the gate frame. [Figure 6]
3. Plug the power supply back into the appropriate VAC power source. If the push bar is functioning correctly,
the gate should open when the bar is pressed.
Figure 9
Power Supply
NOTE
Switch 1
White - Common (COM)
Black - Normally Open (NO)
Red - Normally Closed (NC)
PUD1201R5-0
Ensure primary power to the unit is off before any wire connections are made.
Magnetic Lock / Fail Safe Electric Strike with Push Bar Wiring Diagram
Black / White (+)
Microswitch Push bar can also be used for multiple applications, reference below to
determine wire configuration.
For Assistance: [email protected] +1 (909) 591-8431
Black (-)
Red
COM
N/C
Activation Source
(Supplied by customer)
Switch 2
Green - Common (COM)
Blue - Normally Open (NO)
Yellow - Normally Closed (NC)
Red
Magnetic lock
or Fail-Safe
Electric Strike
COM
Push Bar
Page 13