Alvarion BreezeACCESS 4900 Visão geral - Página 4
Procurar online ou descarregar pdf Visão geral para Router sem fios Alvarion BreezeACCESS 4900. Alvarion BreezeACCESS 4900 5 páginas. 4.9 ghz band licensing and rules
Também para Alvarion BreezeACCESS 4900: Nota de lançamento (9 páginas)
4.9 GHz Band Licensing and Rules Overview
• On the drop down screen in the field "The licensee is" select 'Governmental
Entity'
• Complete all the blank fields (name, address, etc.)
• Click "Next Page."
• Ownership Questions/Qualifications
• Answer each of the questions using the drop-down boxes
• Click "Next Page."
• Type the name of the party authorized to sign the application in the box
• Click "Next Page"
• The control point section comes up
• Click on 'add a control point.' And fill in the control point information, address,
and telephone number.
• Click on "Save"
• Click on "Next Page."
• The Eligibility screen will appear. Enter rule section 90.1203. Describe your
activity just as always – e.g. applicant is a governmental entity, etc.
• Click on "Next Page."
• The Location Page comes up
• Click on "Add"
• Using the drop down box on Location Description Click on "T – Temporary
4
Fixed."
• Using the drop down box on Area of operation code, choose the area of operation
that corresponds with your legal jurisdiction – Countywide, Statewide, or "Other"
(for Citywide operations), or kmra around a center point, or box rectangular
o A dialogue box will open up after you select the Area of Operation. If you
choose:
• The last two questions on the page are whether or not the sites would result in an
Environmental Effect or are located within a Quiet Zone. Answer these questions
using the drop down boxes.
• Click on "Next Page."
• This is the antenna page; no information is needed, unless you are filing for
permanent fixed point-to-point operations. Click on "Next Page."
• This is the frequency page. You do not need to enter anything in this section
because the Universal Licensing System automatically fills in the frequency range
for 4.9 GHz.
• At the bottom of the page, select 'submit' to file the application with the FCC.
4
Temporary Fixed operations are primary. If you propose to operate permanent fixed point-to-point
stations, you must select that option from the drop down menu and each permanent fixed site must be listed
separately on the application. You must provide coordinates, ground elevation, antenna height, HAAT, etc.
for each site.
"Other" indicate "within the legal jurisdiction of _(city)__, "kmra
around a set of coordinates," enter the coordinates, city and state.
"County", enter the county
"State", enter the state
Page 4