Dobinsons BU63-3675 Manual de instalação - Página 7
Procurar online ou descarregar pdf Manual de instalação para Acessórios para automóveis Dobinsons BU63-3675. Dobinsons BU63-3675 13 páginas. Bullbar for vw amarok
and indicator positive wires from the wiring
on the back of the original vehicle lights on
each side.
31. Unclip the wiring from the indicator/parker
lights. Check that the wiring will be long
enough to reach the new bullbar
indicator/parker lights and extend if required.
Using the diagram at the end of this manual,
join the corresponding wires to original
vehicle wires located in the previous step. The
wires can be joined by either using good
quality snap lock crimp connectors or by
soldering. Ensure the connection is secure and
is sufficiently insulated.
32. If fitting a bullbar with fog lights, the fog lights
can be connected using the original vehicle
fog light wires if fitted. If required, cut the old
fog light wiring plugs off and cut the new fog
light wiring plugs and join. If the vehicle is not
fitted with OEM fog lights the wiring loom
supplied can be used. Follow the wiring
diagram at the end of this manual.
33. With help, fit the bulbar into position and
install nuts and bolts supplied.
34. Align the bar with the vehicle into its correct
position, this will leave about a small gap on
each side between the top of the bulbar wing
and the pinch well or flare, to allow for
movement between cab and chassis.
35. Once you are happy with the alignment
tighten the nuts and bolts on each side.
36. Once happy with the alignment of the bullbar
drill 2 x 8mm pinning holes on each side of the
bullbar drilling through both the mounting
bracket mounting plate and bullbar mounting
plate. Fix with 8mm bolts and nyloc nuts to
keep the bullbar in its position.
Dobinsons Springs and Suspension
37. Plug the wires into the indicator, parker light
plug and fog lights. Test all lights and adjust
the position of the fog lights if required.
38. Fit the under bar protection kit now with the
bolts supplied.
39. Refit the number plate and check over all
items removed during installation.
40. Remove packaging from upper section of
bulbar.
41. Trim Wheel arch liners level with bottom of
the under protection kit and secure.
www.dobinsonsprings.com