Etac IM437/S Manual - Página 5
Procurar online ou descarregar pdf Manual para Ajuda à mobilidade Etac IM437/S. Etac IM437/S 7 páginas.
Positioning
Position SlingOn. The press studs in all four corners must
be fastened. Fold SlingOn at least as many times at there
is crossed stitching at the functional handles. Alternative-
ly, roll SlingOn until there is no excess material.
Position SlingOn under the client either from the head or
foot end.
Position SlingOn so that the open end faces away from
the client and the folded part is under the head, pillow
and shoulders.
Alternative method:
For some clients, it will be advisable to position SlingOn
under the small of the client's back.
To position SlingOn under the small of the client's back, the
SlingOn must be "zigzag-folded". The zigzag-folded Sling-
On is folded again (by about one third) and then pushed
under the small of the client's back. The carer on the oppo-
site side can easily grasp and unfold the SlingOn. Then the
SlingOn can be folded out (either upwards or downwards).
Use
After positioning the SlingOn, the user can be mobilised
or the sheet can be pulled down between the two layers.
Release the press studs. The sheet is then placed between
the two layers. The carers gently pull the sheet into
position (Illustration 3). Ideally, the leg straps are pushed
under the client between the two nylon layers.
To remove the top side of SlingOn: A carer grasps
the opposite corner and slowly pulls the top side out
(Illustration 4). The client can now be lifted in the sheet.
Use
Grasp the corner through both layers – the carer's palm is
facing the client with the SlingOn inside the carer's hand.
The carer can now "roll" SlingOn out under the client
(Illustrations 1 and 2). It will often be an advantage if
there are more than two carers, e.g. one carer to hold
SlingOn at the top while the remaining carers press down
on the mattress. Fold one wing out at a time.
In a chair:
Fold SlingOn as above, then push SlingOn down behind
the client's back (same technique as described above).
Release the press studs and pull the sheet down between
the two nylon layers until it is in the correct position.
Remove the nylon layer between the client and the sheet.
The client can now be lifted.
5