Material required:
-
1x M100 (or M150) composting tank
-
1x CL200/CL400 floor-mounted (or
CL300/CL310 bench-mounted) toilet
-
1x CK100 (or CK500) ventilator
-
Ø100mm ventilation pipe & clamps
-
Gravel or pebbles (handful)
-
Wood chips (~150 litres)
-
Ø250mm discharge pipe
-
Garden hose (optional)
Step 1: Planning & Preparation
The below diagram shows a schematic of a
typical installation.
The fan can be put directly above the tank
or at the top of the ventilation pipe. The
toilet has to be placed right above the
composting tank.
For compost removal, it is important that
access to the white hatch is possible. There
are no extra space requires along the other
sides.
It is possible to put the toilet immediately
above the tank without using a discharge
pipe.
__________________________________________________________________________________________
Clivus Multrum International AB
Box 2090
19102 Sollentuna
Sweden
Phone: +46 8 501 642 29
Web:
www.clivusmultrum.eu
E-mail:
Installation Guide
M100/M150 – CL300/CL400 – CK100/CK500
Step 2: Cutting pipe openings
The below diagram shows the top of the
composting tank. Clivus Multrum delivers
the tanks without the openings for the
ventilation and discharge pipes to allow
maximum flexibility when installing.
The typical placement of the pipe openings
is indicated with the circles. However, if
placement requires it is not a problem to
cut the openings elsewhere on the top of
the tank. The ventilation opening can also
be placed at the top end of the side of the
tank.
The openings can be cut with a sharp knife