Aseptico 6520-01-600-8241 Manual de operação e manutenção - Página 5
Procurar online ou descarregar pdf Manual de operação e manutenção para Equipamento dentário Aseptico 6520-01-600-8241. Aseptico 6520-01-600-8241 20 páginas.
SETTING UP THE UNIT:
Fig. 1 - System Components
LAMP
BOOM
BOOM
ADJUSTMENT
HANDLE
POWER
SUPPLY
PEDESTAL
ADJUSMENT KNOB
FOLDING
LEGS
1.
Remove the ALU-40LED-CF Lamp from
its carrying case. Unfold the tripod legs to
a horizontal position. Loosen the
pedestal adjustment knob and slide the
legs to the bottom of the post (see Figure
1). Secure legs in place by firmly
tightening the knob. Set Lamp Assembly
on a stable, level floor surface.
FLEXIBLE GOOSENECK
TELESCOPING
CENTER POST
CENTER POST
HEIGHT
ADJUSTMENT
HANDGRIP
Fig. 2 - Power Supply - Bottom View
AC POWER
CONNECTOR
FUSE
COMPARTMENT
PEDESTAL
2.
LAMP HEAD
w/ADJUSTABLE
CONTROLS
Loosen the handgrip on the center post
(see Figure 1) and raise the post to the
desired height. Tighten the handgrip to
secure post in place. Loosen the boom
adjustment handle and extend boom to
desired length and/or pivot the lamp head
to the desired operating position. Tighten
handle to secure the boom in place.
DC POWER
CONNECTOR
ON/OFF
SWITCH
3