CytoTherm CT-D4 Manual - Página 9
Procurar online ou descarregar pdf Manual para Equipamento de laboratório CytoTherm CT-D4. CytoTherm CT-D4 12 páginas. Dry plasma thawing with massaging action

the alarm will sound. Turn Off the unit. If alarm does not sound, contact CytoTherm. Alarm test should be
performed every 3 months as part of unit maintenance.
BLADDER Maintenance. The bladder does not require periodic maintenance. In case of a plasma bag leak,
remove the BLADDER, rinse the BLADDER under running water and wipe with bleach towelettes or a 10%
bleach solution. Rinse off the bleach.
PARTS LIST CT-D4
CD4-MPL
Pump, Magnetic
14-77
Heater (2 needed)
CT4-PC
Printed Circuit Board
CD4-BTH
Bath Section
CD4-RK
Rack for Dry Thaw
C4-TS
Temperature Sensor
C4-TR
Transformer 120V
CD4-TR2
Transformer 240V
C4-FILT
Air Filter. Per 4 pack
14-77J
Heater 100V (Japan only)
CD4-TRJ
Transformer Dual (Japan)
Always specify model and serial number when ordering.
SOURCES for SUPPLIES
BAGS overwrap 15 cm. wide by 30 cm. (6" x 12") long are available from US Plastics 1390 Neubrecht
Rd. Lima OH 45801 Tel. 800 537-9724. Part #47352.
TECHNICIAN FUNCTIONS
FULL CALIBRATION
Adjust the 10-turn potentiometer so that the voltage between TP1 and Ground (Earth) is .395 V (see wiring
diagram for locations). Actual temperature calibration is then set in Programming Mode (see
PROGRAMMING MODE).
The trimmer near the BODY connector adjusts the display contrast.
DP-SW
Switch, 2-pole
C-TH
Safety Thermostat
CD4-DISP
Display
CD4-BL
Bladder ( 2 needed)
CD4-PM
Program Module
CD4-Y
"Y" Accelerator (use 4)
CD4-LID
Lid for Rack
C-VLVF
Drain Valve Twist Female
C-VLVM
Drain Valve Twist Male
ALG240
Algicide
9