Blueridge BA13L60P Manual de instruções de instalação - Página 5

Procurar online ou descarregar pdf Manual de instruções de instalação para Ar condicionado Blueridge BA13L60P. Blueridge BA13L60P 9 páginas. Single stage

Blueridge BA13L60P Manual de instruções de instalação
wires from disconnect through power wiring hole provided
The unit cabinet must have an uninterrupted or unbroken
ground. The ground must be installed in accordance
with all electrical codes. Failure to follow this warning
for safety. Connect power wiring to contactor.
High voltage power connections to 3-phase models is made
Contol Wiring
The control voltage is 24 VAC. NEC Class I insulated 18
AWG is required for control wiring. For lengths longer than
150 feet, contact your local distributor for technical service.
Ensure the room thermostat is properly installed per
instructions shipped with room thermostat. Generally the
Low voltage wiring must be separated from high voltage
wiring.
Low voltage connections should be in accordance to the
wiring diagram.
Figure 2. Typical Low Voltage Connection
507043-04B
WARNING
WARNING

Start-Up Procedure

1.
Close electrical disconnects to energize system.
2.
Set room thermostat at desired temperature. Be sure
set point is below indoor ambient temperature.
3.
Set the system switch of the thermostat on COOL and
fan switch for continuous operation (ON) or AUTO, as
desired.
4.
section.
Adjusting Charge
Factory charge is shown on the rating label located on the
access panel.
All units are factory charged for 15 feet of connecting line
set. Charge should be adjusted for line set lengths other
than 15 feet. For line sets shorter than 15 feet in length,
remove charge. For line sets longer than 15 feet, add
feet. For lines longer than 50 feet., refer to long line set
guidelines.
Refrigeration Charge Adjustment
Liquid Line Diameter
Issue 1832
Oz. Per Linear Foot
0.6
Table 2.
Page 5 of 9