BlueSky Mast AL350G Series Folha de referência rápida - Página 6
Procurar online ou descarregar pdf Folha de referência rápida para Sistemas de elevação BlueSky Mast AL350G Series. BlueSky Mast AL350G Series 6 páginas. Primary guying deployment
20
Remove and stow the winch
handle.
25
Collapse the tripod legs and
secure them with the Velcro on
the tilt leg.
STAKING KIT - GUY-
TRIPOD
CENTER MAST
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2016 Allendale LLC All Rights Reserved
Quick Reference Sheet - Primary Guying
LOWERING / RECOVERY
21
Release the cam lock and
remove and stow the mounting
pole.
PRIMARY GUY KIT
STAKING KIT - TRIPOD
MOUNTING POLE
AL350G Lift Series
22
Remove all remaining tripod
stakes and stow them.
10M System - HARD CASE #
QUICK REFERENCE
GUY LEADER
7/16 Wrench
(Cam Lock)
10M System - HARD CASE #
Read Manual Before Use
Refer to detailed instructions in the
AL350G Lift Series Manual at all times
23
Collapse the two extended tripod
legs,
1
STRUT BASE PLATE
SHEET
WINCH HANDLE
2
24
Slowly push up on the cross
bars to fold the tripod legs.
WARNING: Pinching Hazard.
LIFT BASE
CROWBAR
USER MANUAL
VELCRO STRAPS