ACR Electronics PATHFINDER 3 SART (SEARCH AND RESCUE TRANSPONDER) Руководство по поддержке продукта - Страница 2

Просмотреть онлайн или скачать pdf Руководство по поддержке продукта для Морское радио ACR Electronics PATHFINDER 3 SART (SEARCH AND RESCUE TRANSPONDER). ACR Electronics PATHFINDER 3 SART (SEARCH AND RESCUE TRANSPONDER) 19 страниц. Search and rescue transponder (sart)

Forward
Congratulations and thank you for purchasing the ACR PathFinder
Transponder (SART). The combination of computer aided design; high quality raw materials
and quality-controlled manufacturing produce a superior product. The Test Facility at ACR can
reproduce some of the harshest environmental conditions known to man. This assures that the
products we produce can stand up to the rigors found in a marine environment. With proper care
and maintenance, your SART will be in service for years to come.
ACR is proud to be certified to the ISO 9001:2000, the international Standard for Quality.
This manual provides installation, operation and maintenance instructions for the PathFinder
SART, hereinafter referred to as the SART. This manual also describes the characteristics and
details of the SART system. This SART has been tested and approved to IEC 1097-1 standards
and meets IMO RES A.802(19). This device complies with the GMDSS provisions of Part 80 of
the FCC rules. Meets EC Council Directive 96/98/EC for ship wheel approval.
Warning notice..............................................................................................................................3
1.0
SART Overview................................................................................................................4
2.0
Introduction.......................................................................................................................5
3.0
Vessel name ......................................................................................................................7
4.0
Life raft stowage ...............................................................................................................8
5.0
Activation..........................................................................................................................8
6.0
Sequence of Operations ....................................................................................................9
7.0
Pole mounted SART .......................................................................................................10
8.0
Hanging SART................................................................................................................11
9.0
Vessel Mounting / Ship installation................................................................................12
10.0
Testing and Maintenance ................................................................................................14
11.0
Servicing .........................................................................................................................15
12.0
Battery Pack Replacement ..............................................................................................15
13.0
Transportation .................................................................................................................16
14.0
Technical Specifications .................................................................................................16
15.0
Warranty Information .....................................................................................................18
16.0
Declaration of conformity...............................................................................................19

Table of Contents

2
TM
Search and Rescue
3
TM
Y1-03-0170 Rev. B
3