American Standard Champion 2002 Руководство по установке - Страница 4
Просмотреть онлайн или скачать pdf Руководство по установке для Внутренняя отделка American Standard Champion 2002. American Standard Champion 2002 6 страниц. American standard two-piece toilet installation instructions
9b
With correct washers in
place (see Step 9a), tighten
COUPLING NUT 1/4 turn
beyond hand tight.
DO NOT OVERTIGHTEN.
11
13
TROUBLE SHOOTING FLUSH VALVE:
SEAL REPLACEMENT:
1.
Disconnect Chain.
2.
Lift float up and remove flush valve seal by pulling seal
out of groove and sliding up over float.
3.
Reverse procedure to install new seal.
FLOAT
NOTE: DO NOT ADD ANY FOREIGN MATERIALS
TO THE SEALING SURFACE.
10
ADJUSTMENTS
a.
Adjust water level. Water level should be adjusted to level indicated in tank by adjusting float
cup. See Step 11 for water level adjustment method.
IMPORTANT:
b.
If bowl fails to siphon, an adjustment may be required with the lift chain. Simply remove the bead
chain from the retainment clip (see Fig. 10A) and take up slack on the chain, and reinsert on lift
rod. Make sure the chain is not too taught.
Turn on water supply.
Adjust water to water
level specified in the tank
by squeezing water level
adjustment clip and
moving FLOAT CUP up
or down along stainless
steel link.
FLUSH
VALVE
SEAL
TOP
CRITICAL LEVEL
MARK ("C.L.")
MUST BE
1" ABOVE
OVERFLOW PIPE
FLOAT
CUP
FILL
VALVE
WATER LEVEL
ADJUSTMENT
CLIP
VALVE
BODY
LOCK NUT
CONE WASHER
COUPLING NUT
(HAND TIGHT ONLY)
12
CARE AND CLEANING
When cleaning your toilet, wash it with mild, soapy water, rinse
thoroughly with clear water and dry with a soft cloth.
!
WARNING:
Do not use in-tank cleaners. These products can
seriously damage fittings in the tank. This damage can cause leakage
and property damage.
American Standard shall not be responsible or liable for any
damage caused by the use of in-tank cleaners.
13a
REFILL TUBE REPLACEMENT:
- 4 -
ARM
NIPPLE
REFILL
TUBE
TANK
LEVER
Fig. 10A
LINK
ADJUSTABLE
HEIGHT
SHANK
WASHER
THREADED
SHANK
PARTS FOR WATER
CONNECTION
(SEE STEP 9)
Diagram 1
Locate bottom portion of
hose clip between the ribs (2)
on bottom of funnel inlet.
Note: Rotate funnel to position
ribs at rear of the tank.
73 0 52 9 - 1 0 0 R e v. M