Astrea Evolve AA20CRK Руководство по замене - Страница 15
Просмотреть онлайн или скачать pdf Руководство по замене для Промышленное оборудование Astrea Evolve AA20CRK. Astrea Evolve AA20CRK 19 страниц. Wetted flow path for 200mm and 250mm chromatography columns
6. Slide this assembly into the threaded height adjust rod/ seal setting ring assembly and
ensure the adjuster seal fits over the flowcell. See Figure 1.11 below
Seal
Figure 1.12 Photograph showing the final location of the adjuster bed support
7. Refit the spacer and central adjuster nut.
8. Lift the adjuster unit into the column tube. Alignment pins are located in the top flange
to assist.
CAUTION Adjuster units are heavy
9. Locate the flange fixing bolts in the underside of the column tube flange and tighten.
10. Replace the flow tube adaptor. To ensure the fitting is tightened correctly, align the
markings on the flow tube and adaptor. As shown in Figure 5.7. Initially hand tighten
and then use correct size spanner. Do not over tighten.
CAUTION – over tightening this adaptor can lead to failure of this component.
Rib on flowtube
Figure 1.13 Photograph showing the alignment of marking on flowtube and adaptor to ensure
component is correctly tightened
14
Adjuster Seal
Groove on adaptor