DORIC Omnetics PZN-12 Руководство пользователя - Страница 5

Просмотреть онлайн или скачать pdf Руководство пользователя для Осветительное оборудование DORIC Omnetics PZN-12. DORIC Omnetics PZN-12 11 страниц. Fiber-optic & electric rotary joint

2

Operations Guide

2.1 Rotary Joint Holders

2.1.1 Holder FRJ large
The Holder FRJ large allows fixed usage of the rotary joint. Simply thread the rotary joint into the holder as shown in
Fig. 2.1. Ensure the stability of the joint in the thread to avoid slippage during use. The holder can then be secured in a
setup using 1/4 (or M6) screws and nuts.
(a)
(b)
Figure 2.1: Holder FRJ large Installation
2.1.2 Gimbal Holder
The GH FRJ (Fig. 2.2) allows swivel movement of the rotary joint along 2 axes. The rotary joint is to be threaded into
the holder (Fig. 2.2) in the same way as with the standard holder. Ensure the stability of the joint in the thread to avoid
slippage during use. The holder can then be secured in a setup using 1/4 (or M6) screws and nuts.
Figure 2.2: HRJ in the GH FRJ
5