CANTERBURY OFFICINA NICOLAZZI Z2218 Руководство - Страница 5

Просмотреть онлайн или скачать pdf Руководство для Сантехника CANTERBURY OFFICINA NICOLAZZI Z2218. CANTERBURY OFFICINA NICOLAZZI Z2218 16 страниц. Deck mounted 5-holes bathtub set with hand spray, goose neck spout

Installation Instructions
Thread the bottom brass lock nut 9, followed
by the bottom rubber washer 10, onto the
Diverter body 8, thread section.
Insert the Diverter body 8, through the tap
hole cut out in the counter top.
Feed the top rubber washer 11 over the
thread section followed by the top brass lock
nut 12.
Adjust the Diverter body to the correct height
and then tighten using a 32mm spanner or
adjustable smooth jawed shifter.
Note: Make sure that the locking nuts are
fully tightened, otherwise the Diverter body
may turn while turning the Diverter lever.
Feed the cover plate 13, onto the Diverter
body, until it is flush with the counter top
surface.
Thread the retaining flange and handle 14,
onto the Diverter spline, securing it firmly by
hand only. See the "Removing and replacing a
handle", on page "12" for additional details.
Insert the hand spray escutcheon 15, into the
cut out hole.
Install the rubber gasket 16, onto the
escutcheon thread extension, followed by the
brass lock nut 17. Secure on to the worktop
underside, but do not over tighten.
Further information Phone (03) 9761 4603
5
Model : Z2214
Continue.......