Dover TWG 250PR Руководство по обслуживанию и ремонту - Страница 8
Просмотреть онлайн или скачать pdf Руководство по обслуживанию и ремонту для Промышленное оборудование Dover TWG 250PR. Dover TWG 250PR 19 страниц.
1. Remove the gearbox from the crane by securing the boom, removing the 20 mounting bolts
and any hydraulic hoses connecting the crane to the gearbox assembly.
2. Orient the gearbox vertical and drain the gear oil from the gearbox. See page 7 of this
manual.
3. Label and disconnect all hoses still attached to the gearbox.
4. Remove the hydraulic motor by removing the 2 bolts in the motor flange.
5. Remove the brake assembly from the gearbox by removing 20 bolts and washers (Item
16, 15). NOTE: Notice the orientation of the ports in relation to the drain and fill holes for
See Servicing The Brake section on page 10 for brake service or repair
reassembly.
6. Inspect the O-ring (Item 44) for damage and replace if necessary.
7. Remove the nylon thrust washer (Item 14) and sun gear (Item 13) from the input
planetary set (Item 11). Inspect for wear or damage and replace if needed.
8. Remove input planet gear assembly by pulling straight up and out of the ring gear (Item
See Servicing The Planetary Set section on page 13 for disassembly and repair.
12).
9. Remove the nylon thrust washer (Item 14) and sun gear (Item 18) from the output
planetary gear set (Item 10). Inspect for wear or damage and replace if needed.
10. Remove output planet gear assembly by pulling straight up and out of the ring gear
See Servicing The Planetary Set section on page 13 for disassembly and
(Item 12).
repair.
11. To service the pinion gear or pinion bearings see
section on Page 12 of this manual for disassembly and repair.
13
27
DISASSEMBLY
44
19
11 12
14
18
8
Servicing The Pinion Gear/Bearings
.