Amphenol Telect nrg600BT08-M Руководство по установке - Страница 7
Просмотреть онлайн или скачать pdf Руководство по установке для Автоматические выключатели Amphenol Telect nrg600BT08-M. Amphenol Telect nrg600BT08-M 20 страниц. 600a load center with nrgsmart remote monitoring
WARNING! Failure to properly ground this equipment can create
hazardous conditions for installation personnel and for the equipment.
ALERT! Only use components and crimping tools approved by agencies
or certifying bodies recognized in your country or region, such as
Underwriter's Laboratories (UL), TUV, etc.
6.
Use a listed (approved) crimping tool to attach a listed (approved),
dual-hole compression lug for 1/4-20 studs on 5/8-in. centers onto #2
AWG ground wire.
7.
If desired (highly recommended), lightly coat antioxidant on lug,
grounding terminal and surrounding contacting surface.
8.
Connect the lug using the 1/4 -20 bolts, lock washers and flat
washers provided.
9.
Tighten bolts to ~50 in.-lb (~5.6 N•m), max.
10.
Make sure the power is off (open breaker, dummy fuse or open fuse
holder at primary power distribution unit, PDU or battery) before
connecting this panel's input cables to a PDU or battery.
WARNING! Before connecting input power cables, make sure the
input power to the panel is turned off.
11.
For input wiring - wiring used as inputs to this load center:
•
Crimp dual-hole compression lugs onto #1 AWG to 750MCM copper
wires. The choice of input wiring depends on the following criteria:
•
Input interrupt device rating affects the size of input wiring.
•
Ambient operating temperature affects the type of input wire
insulation. For further information consult the National Electrical
Code (NEC).
nrg600BT08-M
12.
Insulate lug barrels with UL94 V-0-rated heat-shrink tubing.
13.
Clean terminals and lugs with nonabrasive, nonmetallic pad.
14.
If required, lightly coat antioxidant on lugs and input BATT and
RETURN terminals, and then connect the lugs to input terminals on
the back of the panel.
15.
Tighten lugs to 150 in.-lb (~17 N•m), max.
16.
Make sure all interrupter positions are either empty, off or contain
dummy fuses (phoney, inoperative all-plastic slugs).
ALERT! Only qualified service personnel should replace fuses. The
installer must verify that a readily accessible protection device is
incorporated in the building wiring feeding the panel: 750A (max.)
protection device for a 600A panel.
7
All rights reserved. 12.05.19 145121-2 A0
Amphenol Network Solutions
509.926.6000 – amphenol-ns.com