Follett HCC1000WBS Руководство по установке - Страница 8
Просмотреть онлайн или скачать pdf Руководство по установке для Льдогенератор Follett HCC1000WBS. Follett HCC1000WBS 16 страниц. For ice storage bins. ice machine models with ride technology
Install the ice transport tube.
5.1
Ice transport tube installation
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
runs see guide on page 14.
• Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to bin
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
1/4˝ (6,4mm)
➋
as needed to prevent dips and traps from forming. For long tube
➍
➐
➑
➓
self-contained
Hot Water
160 F (71 C)
1' (0,3m)
➊
➌
➏
➒
Ice transport tube
BIN • RIDE Technology
5
➎
➎