Follett HCD710ABT Руководство по установке - Страница 9
Просмотреть онлайн или скачать pdf Руководство по установке для Льдогенератор Follett HCD710ABT. Follett HCD710ABT 12 страниц. To ice storage bin top-mount applications
Также для Follett HCD710ABT: Краткое руководство по эксплуатации (8 страниц)
5.
Internal Connections
Air-cooled ice machines – follow steps 5.1 and 5.5.
Water-cooled ice machines – follow steps 5.6 through 5.12.
5.1
Ice transport tube
➋
§ Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
§ Insert ice transport tube all the way into coupling
and tighten nut firmly
5.3
Power cord
§ Remove twist tie.
§ Carefully pass plug thru opening and plug into wall
outlet.
§ For H_E units, install a suitable plug.
BIN • TOP-MOUNT
➊
➊
.
➋
.
5.2
Potable water lines
§ Insert potable water line into valve
5.4
Power cord
§ Position plate into opening and secure with
supplied screw.
WARNING!
Plate must be securely installed to ensure proper
equipment ground.
Horizon 710/1010/1410
➊
➊
.
9