Follett HMD1650NBT Руководство по установке - Страница 10
Просмотреть онлайн или скачать pdf Руководство по установке для Льдогенератор Follett HMD1650NBT. Follett HMD1650NBT 17 страниц. For ice storage bin top-mount applications
Connect utilities to louvered docking assembly.
6.1
Water and drain
➋
➊
• Remove access panel if necessary.
➊
• Install drain line
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Install ice machine potable water
➋
supply
• Replace access panel
10
.
External connections
remote condensing
6
BIN • TOP-MOUNT