Follett Horizon Elite Chewblet HCD1010NBS Руководство по установке - Страница 8

Просмотреть онлайн или скачать pdf Руководство по установке для Льдогенератор Follett Horizon Elite Chewblet HCD1010NBS. Follett Horizon Elite Chewblet HCD1010NBS 16 страниц. For drop-ins
Также для Follett Horizon Elite Chewblet HCD1010NBS: Руководство (8 страниц), Руководство по установке (17 страниц), Руководство (8 страниц)

Follett Horizon Elite Chewblet HCD1010NBS Руководство по установке
Install the ice transport tube.
5.1
Ice transport tube installation
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
For long tube runs see guide on page 13.
• Pitch ice transport tube at least 1/4" per foot (6,4 mm/0,3 m)
• Ice transport tube must drain towards ice machine
Ice transport tube to bin
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
as needed to prevent dips and traps from forming.
Hot Water
160 F (71 C)
1/4"
1'
remote condensing
Transport tube
BIN • RIDE Technology
5