Follett Horizon Elite Chewblet HCD1010NMS Руководство по установке - Страница 8
Просмотреть онлайн или скачать pdf Руководство по установке для Льдогенератор Follett Horizon Elite Chewblet HCD1010NMS. Follett Horizon Elite Chewblet HCD1010NMS 16 страниц. Ice machine with ride technology installation instructions for ice manager diverter valve
Также для Follett Horizon Elite Chewblet HCD1010NMS: Руководство (8 страниц), Руководство по установке (17 страниц), Руководство (8 страниц)
Install the ice transport tube.
4.2
Ice transport tube installation.
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
For long tube runs see guide on page 15.
• Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
➋
Hot Water
160 F (71 C)
➊
1/4"
➌
1'
➋
as needed to prevent dips and traps from forming.
➍
➐
➏
➎
➊
➌
➏
remote condensing
Ice transport tube
➍
➐
ICE MANAGER
4
➎