Draper Premier XL 220 Руководство по эксплуатации - Страница 2
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Проекционный экран Draper Premier XL 220. Draper Premier XL 220 7 страниц. Electric projection screen
Premier XL
®
Electric Projection Screen
Section 1 - Electrical Connections
Screen operates on 220V AC, 50 Hz., 1 ph. current. Screen ships with internal wiring complete and
control
switch(es)
fully boxed.
Wire to connect screen to
switch(es)
Please Note: Plug and Play is supplied with a 294.64cm cable lead. Longer lead can be
substituted by removing two screws in motor end of roller, removing lead, plugging new lead
in, and replacing screws.
Please Note: Screen must be installed in accordance with requirements of Local Building
Codes, Canadian Electrical Code (CEC), CAN/CSA C22.1 and National Electric Code (NEC),
NFPA 70. An appropriate disconnect device shall be provided as part of building installation.
CAUTION: All operating switches should be "off" before power is connected.
Improper installation and use of PremierXL can result in serious injury or death. Primarily, injuries can occur when Unit falls due to imprecise installation, mishandling of
Unit during installation or installation on an insufficient wall or ceiling structure. Please use extreme care.
1. Please read following installation guidelines thoroughly and follow them carefully. Failure to do so may cause product to fall or otherwise fail, and could result in
serious injury.
2. Installation and calibration of Unit should only be performed by an authorized, qualified, and experienced professional. In particular, electrical work and wiring
[indicated in diagram by dashed lines] must be completed only by a qualified professional electrician who has read this manual completely and is familiar with
construction and operation of this equipment and hazards involved.
3. Do not affix unit to wall or ceilings that have inadequate strength to permanently hold unit during use. It is owner's and installer's responsibility to confirm wall or
ceiling to which unit attaches is sufficient to permanently hold weight and stress loads of unit at all times. Draper, Inc., is not responsible for improper installation,
application, testing or workmanship related to product at place of installation.
4. It is installer's responsibility to make sure appropriate fasteners are used for mounting.
5. All brackets and other hardware must be installed level. Unit must be level.
6. Turn off power and any nearby equipment or cables carrying electricity before connecting switches, wires, controls, or electrical components.
7. After installation, entire system, including all sensors, should be carefully tested to ensure safe and normal operation.
8. The safety features of Unit, including sensors, should never be disabled, bypassed or overridden. The system should not be operated until all safety features,
including sensors, are properly and completely installed, calibrated and tested.
9. Unit may need to comply with local, state or district rules and regulations, in particular when installed in schools. All applicable rules and regulations should be
reviewed before installation and use.
10. Failure to precisely follow installation guidelines invalidates all warranties.
11. Custom products/installations may not be reflected in this manual. Call Draper, Inc., if you have questions about installation of custom products or any questions
about your installation.
1. Installation should be completed by a qualified installer. Look for any job site conditions that could interfere with installation or operation of system.
2. Read carefully and be sure to understand all installation instructions and all related operations manuals. These instructions are intended as a guide for installer
and owner. They should be followed closely and combined with expertise of experienced qualified installers. Draper, Inc., is not responsible for improper
installation, application, testing or workmanship related to product at place of installation. Instructions are packed in carton. Please retain all instructions for future
use.
3. Locate and lay out all pieces.
4. Inspect all boxes to make sure you have received proper Unit parts.
5. Screen operates on 220V AC, 50 Hz., 1 ph. current.
6. If you have any difficulties with installing, servicing or operating your Unit, call your dealer or Draper, Inc., (765) 987-7999.
/ Targa XL
®
and
switch(es)
to power supply should be furnished by installer.
Before Beginning Installation
220V
FOR OPTIONAL PLUG AND PLAY:
Plug-in power cord option available with Motor with Internal
Low Voltage Controller. For Reconfiguration/Conversion of
Non-detachable Power Cord to Field Wiring for Models PRE-28,
PRE-29, PRE-30, TAR-28 TAR-29 and TAR-30 Only:
1. Disconnect cord plug from outlet.
2. Remove junction box cover.
3. Disconnect wire nuts from black, white and green wires.
4. Remove power cord and strain relief from screen.
5. Connect black motor wire to "hot" supply wire.
6. Connect white motor wire to "neutral" supply wire.
7. Connect green/yellow wire to "ground" supply wire.
8. Replace junction box cover.
WARNING
page 2 of 7