Bdcom S1210-8P-150 Руководство пользователя - Страница 11

Просмотреть онлайн или скачать pdf Руководство пользователя для Переключатель Bdcom S1210-8P-150. Bdcom S1210-8P-150 14 страниц. Gigabit uplink poe switch

Bdcom S1210-8P-150 Руководство пользователя

Rack Installation

To install the device in an EIA standard-sized, 19-inch rack, follow the instructions
described below:
1. Check the grounding and stability of the rack.
2. Secure the supplied rack-mounting brackets to each side of the device with
supplied screws, as illustrated in the
3.
After the brackets are attached to the device, use suitable screws (not provided) to
secure the brackets to the rack, as illustrated in the following figure.

Turn on the switch

Plug in the negative connector of the provided power cord into the power socket of
the device, and the positive connector into a power outlet . After the device is powered
on, it begins the Power-On Self-Test. The PWR LED indicator will light on all the time.
following figure.