NAVI-TRAC LT PAVILION INSTALLATION SAFETY
Your own installation techniques will evolve to fit the varied needs of your clients, the experience level of your installation
crews, the nature of other tentage that may be common to the installation site being planned, and the equipment that you
may have available or with which you feel most comfortable. Whatever techniques you adapt for your crews, we encour-
age you to keep safety utmost in mind.
Please read through this assembly manual completely before beginning your installation. Be sure the proper equipment,
crew and safety precautions are in place. We hope that you enjoy the design features of the Navi-Trac Lite™ Pavilion
each time the unit is installed.
1.
It is recommended that workers wear safety shoes and hard-hats on site.
2.
When moving frame sections by hand, use proper lifting techniques to protect the back, and avoid pinching
fingers while making hardware connections.
3.
Be sure all workers are cautious and attentive to the falling paths of frame sections being raised or
lowered.
4.
Be aware to avoid contact of frame sections with any overhead power lines near the site.
5.
When anchoring the structure, avoid all underground power lines and gas lines or other utility easements.
6.
Keep site clear of debris to avoid tripping, especially while carrying frame parts or bundles of fabric.
7.
Do not drag bundles of fabric on concrete, asphalt, or ground as this can cause damage to the fabric from
abrasion through the bag.
8.
Do not climb onto the fabric "roof" of the structure. When necessary, work safely from a ladder of
appropriate size.
9.
When standing frame sections to vertical, or when lowering, use a smooth motion and have other
workers "foot" the base of the section to avoid slippage along the ground.
10.
When installing gabled end units, be sure all beams are stabilized either by safety guys or cross-
cabling until connected to a section of the unit that is already stabilized in this manner.
11.
When installing a unit in which the overall length exceeds 60 ft, add one extra X-cabled bay for each addi-
tional 60 ft of length. To meet design loads, no more than 60 ft of consecutive length can remain non-X-
cabled.
12.
The installation method described here requires coordination of tasks between workers. A safe installation is
dependent on that coordination. Please work cooperatively as a team.
13.
Anchor recommends a factor of safety of at least 2X be used to resist all loads.
GUIDELINES
2