Anden DH4AS35 Краткое руководство по эксплуатации - Страница 2
Просмотреть онлайн или скачать pdf Краткое руководство по эксплуатации для Увлажнить Anden DH4AS35. Anden DH4AS35 4 страницы. Steam humidifier
Install drain line
• Secure 7/8" drain line with the hose clamp provided. Do not over tighten.
• Make sure drain line has a constant downward slope and is not kinked or blocked.
• If floor drain is not available, use condensate pump to route water to a drain.
NOTE: The humidifier uses cold water to temper drain water to less than 140°F.
Water quality and
canister selection
The Steam Humidifier operates on water with conductivity between
75 and 1,250 EC.
• Connect to water supply. Do not use RO or DI water.
• Use cold water only.
WATER QUALITY GUIDELINES
Grains/
EC (1:1)
Research
Gal
Hardness
Naturally
75-100
0-3
Naturally
100-300
3-9
300-500
9-15
Moderately
500-650
15-20
650-850
20-25
850-1250
25-36
Very Hard
above
above
Extremely
1250
36
Softened
2
4
5
Recommended Canister by Voltage
120VAC
208VAC
Installation Not
AS80LC
Soft
Recommended
AS80LC
AS80LC
Soft
Slightly
AS80LC
AS80
Hard
AS80LC
AS80
Hard
Hard
AS80LC
AS80
AS80LC
AS80
Installation Not Recommended
Hard
AS80
AS80
Capacity
Settings are chosen based on desired capacity.
STEAM CAPACITY
Amperage
(Nominal)
Circuit board dip switches
For max capacity connect to 240V and set dip
switch from 11.5 to 16 Amps.
240VAC
AS80LC
AS80LC
AS80
AS80
AS80
AS80
AS80
6
Steam Capacity
Voltage
120V
11.5
208V
240V
120V
208V
16.0
(recommended)
240V
(recommended)
120
FACTORY SETTING FOR
11.5 AMP NOMINAL OPERATION
120
208
240
LED D8
RECOMMENDED SETTING
SLIDE DIP SWITCH #1 TO
"ON" POSITION FOR 16.0 AMP
NOMINAL OPERATION
Maximum
(gal/day)
11.5
20.5
23.3
16.0
30.0
34.6
208
240
90-1959