Andrew Alliance Waters Vacuum+ Руководство пользователя - Страница 4
Просмотреть онлайн или скачать pdf Руководство пользователя для Лабораторное оборудование Andrew Alliance Waters Vacuum+. Andrew Alliance Waters Vacuum+ 8 страниц.
Getting started
A. Installation
Place the vacuum pump on the floor or on a workbench other than the one
1
being used for your experimental set-up.
When the pump is ON it could generate vibrations, which may influence experiment
setup if placed on the same workbench.
Plug pipe between vacuum Domino and vacuum pump.
2
Verify the absence of tension in the pipe.
On the vacuum pump body, turn the switch ON.
3
Connect the power switch to the bridge USB port.
4
Connect the vacuum pump power cord to the power switch A/C output port.
5
Be sure to use the provided ground adator pin when present (i.e. European sockets).
Plug the power switch power cord to a power source.
6
Make sure the specially designed shims are placed on the
7
bottom of the vacuum Domino.
Additional instructions
i
• Check the performances of vacuum Domino when the μΕlution™ plate is
present.The vacuum should be between 2.5–4 Hg. If not, you may need to
adjust the pump accordingly.
Note: For this step the pump must be powered directly from the wall (not
through the power switch).
• At the beginning of the experiment, a waste consumable must be placed
inside the vacuum Domino, beneath the μElution™ plate.