Ankom TDF69 Процедура обслуживания - Страница 2

Просмотреть онлайн или скачать pdf Процедура обслуживания для Измерительные приборы Ankom TDF69. Ankom TDF69 4 страницы. Vacuum sensor installation

Remove the vacuum sensor cable tube (continued).
d. Gently pull the vacuum sensor out of the plastic
1/4" cable holder.
e. Disconnect the three pin white connector J9 that
is second from the bottom on the MUX-P
circuit board in the electrical enclosure. The
MUX-P circuit board is found on the left side
panel of the electrical enclosure, closest to the
front of the instrument. Set the white connector
aside for later use.
f. Use a small flathead screw driver to push the
tabs down to remove each wire terminal.
g. Loosen the explosion proof fitting by hand.
h. Gently pull each wire terminal through the
fitting one at a time to ensure they do not get
stuck in the fitting.
3.
Install the new TDF69 Vacuum Sensor Assembly.
a. Feed the wire terminals at the end of the
vacuum sensor cable through the explosion
proof fitting so that the heat shrink at the end of
the gray cable jacket is showing.
b. Hand tighten the explosion proof fitting.
c. Give a light tug on the cable to ensure that the
cable is unable to pull back through.
ANKOM Technology  2052 O'Neil Road  Email: [email protected]  Phone: 315-986-8090  Fax: 315-986-8091
Vacuum Sensor Installation
TDF
Explosion proof fitting
Vacuum Sensor
Three pin
white connector
Wire terminals
Heat shrink
013
Service Procedure
Revised: 07/16/2014
pg. 2 of 4