3One data IES205 Руководство по установке оборудования - Страница 5
Просмотреть онлайн или скачать pdf Руководство по установке оборудования для Переключатель 3One data IES205. 3One data IES205 9 страниц.
Power
Power
input
input
Power
Power input
input:
Top
Top
Top view
Top
view
view
view
IES205 series Ethernet Switch adopt 3 bits terminal block for power
input(V-,FG,V+), V-, V+ for 12VDC~36VDC power input, FG for
connecting device shell.
Installation
Installation
Installation
Installation:
Before installation, confirm that
installation require, including the power needs and abundant space.
whether it is close to the connection equipment and other
equipments are prepared or not.
Installation
Installation
require
require
require as as as as below
Installation
Installation require
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power need: 24VDC(12VDC~36VDC) power input
6. Environment: -40 to 75°C
Storage Temperature: -45°C to 85°C
Relative humidity 10% to 95%
DIN-Rail
DIN-Rail
Installation
Installation
DIN-Rail
DIN-Rail Installation
Installation
In order to use in industrial environments expediently, IES205
series adopt 35mm DIN-Rail installation, the installation steps as
fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be suitability
or not .
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will insert into place as shown
Your Serial and Data Communications Expert
the work environment meet the
below
below
below
Front view
Front
Front
Front
view
view
view
Shenzhen 3onedata Technology Co.,Ltd